{"id":23234,"date":"2026-07-14T12:51:16","date_gmt":"2026-07-14T12:51:16","guid":{"rendered":"https:\/\/www.automakers.cz\/?p=23234"},"modified":"2026-07-14T12:51:16","modified_gmt":"2026-07-14T12:51:16","slug":"nejvetsi-dalnicni-zakazka-v-historii-miri-do-finale","status":"publish","type":"post","link":"https:\/\/www.automakers.cz\/?p=23234","title":{"rendered":"Nejv\u011bt\u0161\u00ed d\u00e1lni\u010dn\u00ed zak\u00e1zka v historii m\u00ed\u0159\u00ed do fin\u00e1le"},"content":{"rendered":"<p><strong>Ministerstvo dopravy obdr\u017eelo fin\u00e1ln\u00ed nab\u00eddky od t\u0159\u00ed stavebn\u00edch konsorci\u00ed na realizaci chyb\u011bj\u00edc\u00edch \u00fasek\u016f d\u00e1lnice D35 mezi Opatovcem a Mohelnic\u00ed formou partnerstv\u00ed ve\u0159ejn\u00e9ho a soukrom\u00e9ho sektoru (PPP \u2013 Public-Private Partnership). Nyn\u00ed za\u010dne jejich vyhodnocen\u00ed a n\u00e1sledovat bude rozhodnut\u00ed o v\u00fdb\u011bru nejvhodn\u011bj\u0161\u00ed nab\u00eddky. <\/strong><!--more--><\/p>\n<p>Po rozhodnut\u00ed bude koncesion\u00e1\u0159sk\u00e1 smlouva p\u0159edlo\u017eena ke schv\u00e1len\u00ed vl\u00e1d\u011b a Poslaneck\u00e9 sn\u011bmovn\u011b. Pokud bude cel\u00fd proces pokra\u010dovat podle pl\u00e1nu, stavebn\u00ed pr\u00e1ce by mohly za\u010d\u00edt je\u0161t\u011b letos.<\/p>\n<p>PPP projekt zahrnuje v\u00fdstavbu, financov\u00e1n\u00ed, provoz a \u00fadr\u017ebu nov\u00fdch \u00fasek\u016f D35 Opatovec \u2013 Star\u00e9 M\u011bsto a Star\u00e9 M\u011bsto \u2013 Mohelnice v celkov\u00e9 d\u00e9lce 35,4 kilometru. Sou\u010d\u00e1st\u00ed projektu bude tak\u00e9 n\u00e1sledn\u00fd provoz a b\u011b\u017en\u00e1 \u00fadr\u017eba navazuj\u00edc\u00edho sedmn\u00e1ctikilometrov\u00e9ho \u00faseku mezi Litomy\u0161l\u00ed a Opatovcem, kter\u00fd v sou\u010dasnosti buduje \u0158editelstv\u00ed silnic a d\u00e1lnic. Do PPP projektu bude za\u0159azen a\u017e po dokon\u010den\u00ed nov\u00fdch\u00a0 \u00fasek\u016f. V\u00fdznamnou sou\u010d\u00e1st\u00ed stavby budou tak\u00e9 dva tunely \u2013 t\u00e9m\u011b\u0159 \u010dty\u0159kilometrov\u00fd tunel D\u011bt\u0159ichov a 1,3 kilometru dlouh\u00fd tunel Malet\u00edn.<\/p>\n<blockquote><p>\u201eBl\u00ed\u017e\u00edme se do z\u00e1v\u011bre\u010dn\u00e9 f\u00e1ze historicky nejv\u011bt\u0161\u00edho PPP projektu dopravn\u00ed infrastruktury v \u010cesk\u00e9 republice. Obdr\u017eeli jsme nab\u00eddky od t\u0159\u00ed renomovan\u00fdch mezin\u00e1rodn\u00edch konsorci\u00ed a okam\u017eit\u011b jsme zah\u00e1jili jejich hodnocen\u00ed. Te\u010f n\u00e1s \u010dek\u00e1 pe\u010dliv\u00e9 posouzen\u00ed tis\u00edc\u016f stran p\u0159edlo\u017een\u00e9 dokumentace. Vyhodnocen\u00ed nab\u00eddek a p\u0159edlo\u017een\u00ed t\u00e9 nejvhodn\u011bj\u0161\u00ed ke schv\u00e1len\u00ed vl\u00e1d\u011b a Poslaneck\u00e9 sn\u011bmovn\u011b chceme stihnout v prvn\u00ed polovin\u011b podzimu,\u201c \u0159\u00edk\u00e1 ministr dopravy Ivan Bedn\u00e1rik.<\/p><\/blockquote>\n<p>Sout\u011b\u017en\u00edho dialogu se p\u016fvodn\u011b \u00fa\u010dastnili \u010dty\u0159i mezin\u00e1rodn\u011b renomovan\u00ed uchaze\u010di, kte\u0159\u00ed splnili kvalifika\u010dn\u00ed podm\u00ednky. Jedno z konsorci\u00ed na konci roku 2025 ze zad\u00e1vac\u00edho \u0159\u00edzen\u00ed odstoupilo, k pod\u00e1n\u00ed fin\u00e1ln\u00edch nab\u00eddek proto byli vyzv\u00e1ni t\u0159i uchaze\u010di.<\/p>\n<p>Ve stanoven\u00e9m term\u00ednu, 10. \u010dervence do 16:00 hodin, Ministerstvo dopravy obdr\u017eelo nab\u00eddky od n\u00e1sleduj\u00edc\u00edch \u00fa\u010dastn\u00edk\u016f (v abecedn\u00edm po\u0159ad\u00ed; uveden\u00e1 cena p\u0159edstavuje \u010distou sou\u010dasnou hodnotu navrhovan\u00fdch plateb za dostupnost):<\/p>\n<p>\u2022 Konsorcium LitMo (tvo\u0159en\u00e9 spole\u010dnostmi FCC Concesiones de Infraestructuras, S.L., Meridiam Eastern Europe IV A S.A.S. a Metrostav Concessions a.s.): 76 162 557 949 K\u010d<br \/>\n\u2022 Konsorcium ViaCM (tvo\u0159en\u00e9 spole\u010dnostmi VINCI Highways S.A.S., Abrdn European Sustainable Infrastructure GP V Limited, John Laing Europe Holdings B.V): 85 980 392 592 K\u010d<br \/>\n\u2022 Konsorcium ViAlliance35 (tvo\u0159en\u00e9 spole\u010dnostmi Cintra Global SE, STRABAG Motorway GmbH, Budimex s.a. a Invesis B.V.): 71 323 843 913 K\u010d<\/p>\n<blockquote><p>\u201cJsme r\u00e1di, \u017ee jsme dos\u00e1hli dal\u0161\u00edho miln\u00edku v r\u00e1mci zad\u00e1vac\u00edho \u0159\u00edzen\u00ed historicky nejv\u011bt\u0161\u00edho PPP projektu v \u010cesk\u00e9 republice. T\u00fdm Ministerstva dopravy b\u011bhem posledn\u00edch m\u011bs\u00edc\u016f zodpov\u011bd\u011bl skoro 300 odborn\u00fdch dotaz\u016f od z\u00e1jemc\u016f o v\u00fdstavbu, v\u0161echny jsme je zodpov\u00eddali obratem, aby nevznikaly \u017e\u00e1dn\u00e9 zbyte\u010dn\u00e9 pr\u016ftahy na na\u0161\u00ed stran\u011b,\u201c zd\u016fraz\u0148uje Lenka Hamplov\u00e1, vrchn\u00ed \u0159editelka sekce ekonomick\u00e9 a infrastrukturn\u00ed a pokra\u010duje: \u201eVe stejn\u011b rychl\u00e9m tempu budeme pokra\u010dovat i nad\u00e1le. Paraleln\u011b s vyhodnocov\u00e1n\u00edm obdr\u017een\u00fdch nab\u00eddek budeme p\u0159ipravovat dokumenty pro p\u0159edlo\u017een\u00ed fin\u00e1ln\u00edho 1rozhodnut\u00ed do meziresortn\u00edho p\u0159ipom\u00ednkov\u00e9ho \u0159\u00edzen\u00ed, na vl\u00e1du a n\u00e1sledn\u011b do Poslaneck\u00e9 sn\u011bmovny. D\u011bl\u00e1me maximum proto, aby prvn\u00ed stroje na staveni\u0161t\u011b vyjeli je\u0161t\u011b v leto\u0161n\u00edm roce. Je i p\u0159irozen\u00fdm z\u00e1jmem koncesion\u00e1\u0159e, aby mohl za\u010d\u00edt stav\u011bt co nejd\u0159\u00edve.\u201c<\/p><\/blockquote>\n<p>Vedle nab\u00eddkov\u00e9 ceny budou hodnoceny tak\u00e9 dva kvalitativn\u00ed parametry t\u00fdkaj\u00edc\u00ed se stavu d\u00e1lnice p\u0159i jej\u00edm p\u0159ed\u00e1n\u00ed zp\u011bt st\u00e1tu po skon\u010den\u00ed koncese. Vy\u0161\u0161\u00ed kvalita oproti stanoven\u00e9mu minimu bude v hodnocen\u00ed zv\u00fdhodn\u011bna. Po dokon\u010den\u00ed posouzen\u00ed nab\u00eddek bude s vybran\u00fdm uchaze\u010dem uzav\u0159ena koncesion\u00e1\u0159sk\u00e1 smlouva, a to po jej\u00edm schv\u00e1len\u00ed vl\u00e1dou a Poslaneckou sn\u011bmovnou. Po jej\u00edm uzav\u0159en\u00ed prob\u011bhne je\u0161t\u011b proces tzv. finan\u010dn\u00edho uzav\u0159en\u00ed koncesion\u00e1\u0159sk\u00e9 smlouvy mezi koncesion\u00e1\u0159em a subjekty, kter\u00e9 mu poskytuj\u00ed finance na realizaci d\u00e1lnice.<\/p>\n<p>Pro \u0159idi\u010de bude d\u00e1lnice zpoplatn\u011bna stejn\u00fdm zp\u016fsobem jako ostatn\u00ed \u010desk\u00e9 d\u00e1lnice. V\u00fdnosy z d\u00e1lni\u010dn\u00edch poplatk\u016f budou p\u0159\u00edjmem St\u00e1tn\u00edho fondu dopravn\u00ed infrastruktury a nijak nesouvisej\u00ed s odm\u011bnou koncesion\u00e1\u0159e. Ten bude dost\u00e1vat platby v\u00fdhradn\u011b za to, \u017ee bude d\u00e1lnice dlouhodob\u011b dostupn\u00e1 jej\u00edm u\u017eivatel\u016fm ve smluvn\u011b stanoven\u00e9 kvalit\u011b.<\/p>\n<blockquote><p>\u201eJako st\u00e1t za\u010dneme koncesion\u00e1\u0159i hradit platby za dostupnost a\u017e ve chv\u00edli, kdy budou v\u0161echny \u00faseky dokon\u010deny a uvedeny do provozu. D\u00edky syst\u00e9mu plateb nav\u00e1zan\u00e9mu na dostupnost a kvalitativn\u00ed parametry je koncesion\u00e1\u0159 motivov\u00e1n stavbu dokon\u010dit co nejrychleji a n\u00e1sledn\u011b udr\u017eovat d\u00e1lnici po celou dobu koncese v odpov\u00eddaj\u00edc\u00ed kvalit\u011b,\u201c vysv\u011btluje Jan Ornst, vedouc\u00ed samostatn\u00e9ho odd\u011blen\u00ed PPP projekt\u016f Ministerstva dopravy.<\/p><\/blockquote>\n<p>D\u00e1lnice D35 p\u0159edstavuje jednu z nejv\u00fdznamn\u011bj\u0161\u00edch dopravn\u00edch staveb v \u010cesk\u00e9 republice. Po sv\u00e9m dokon\u010den\u00ed propoj\u00ed v\u00fdchodn\u00ed \u010cechy se st\u0159edn\u00ed Moravo u, v\u00fdrazn\u011b ulev\u00ed obc\u00edm na trase sou\u010dasn\u00e9 silnice I\/35 a odvede \u010d\u00e1st tranzitn\u00ed dopravy z p\u0159et\u00ed\u017een\u00e9 d\u00e1lnice D1. \u0158editelstv\u00ed silnic a d\u00e1lnic v sou\u010dasnosti buduje na D35 celkem 47,5 kilometr\u016f nov\u00fdch \u00fasek\u016f.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-23238\" src=\"http:\/\/www.automakers.cz\/wp-content\/uploads\/2026\/07\/DSC_5818-900x505.jpg\" alt=\"\" width=\"986\" height=\"553\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ministerstvo dopravy obdr\u017eelo fin\u00e1ln\u00ed nab\u00eddky od t\u0159\u00ed stavebn\u00edch konsorci\u00ed na realizaci chyb\u011bj\u00edc\u00edch \u00fasek\u016f d\u00e1lnice D35&#8230;<\/p>\n","protected":false},"author":2,"featured_media":23235,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47,25,81,50],"tags":[],"class_list":["post-23234","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-doprava","category-legislativa","category-tendry","category-zakazky"],"_links":{"self":[{"href":"https:\/\/www.automakers.cz\/index.php?rest_route=\/wp\/v2\/posts\/23234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.automakers.cz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.automakers.cz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.automakers.cz\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.automakers.cz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23234"}],"version-history":[{"count":2,"href":"https:\/\/www.automakers.cz\/index.php?rest_route=\/wp\/v2\/posts\/23234\/revisions"}],"predecessor-version":[{"id":23240,"href":"https:\/\/www.automakers.cz\/index.php?rest_route=\/wp\/v2\/posts\/23234\/revisions\/23240"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.automakers.cz\/index.php?rest_route=\/wp\/v2\/media\/23235"}],"wp:attachment":[{"href":"https:\/\/www.automakers.cz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.automakers.cz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.automakers.cz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}